Case Case
Case Angola projects one
  • Your present position: Home Case
State: Luanda Airport Oil Depot subcontract Project officially started in 2014 with duration of about 24 months. The main content of the project is the foundation construction of 4 oil tanks and 1 fire water tank, outdoor road and ancillary facilities construction inside the oil depot. Currently the project has been successfully delivered and put into operation.
State: Design and maintenance of three urban water supplies project officially started in 2015 with the duration of 18 months. The main content of the project is to renovate and upgrade the equipment and facilities of water treatment, mechanical and electrical control, reservoir and part of the pipe networks for the water treatment plants in three capital city, Uige, Malanje, Ndalatando in Angola to meet the growing needs of drinking water supply.
State: Description:The civil construction of Matola oil depot construction project undertaken by Jiangsu Geology& Engineering Co., Ltd after more than 2 years construction since August 1st, 2014 has been successfully completed. During the project period, the owner, Puma energy and the general contractor, CPPE provided careful guidance and assistance. 1.  Project Overview1.1  General overviewThis project, located in Matola port, Mozambique, mainly consists of 4 aspects: foundation construction of 9 oil tank with the capacity of 12200 m3, 2 aviation kerosene tank with the capacity of 2534m3 and 1 fire water tank; foundation construction of supporting facilities of oil tanks and fire water tank; Construction of production management building and steel...
State: The construction site of Chimanimani wild life park is located in Chimanimani nature reserve.The owner of the project is Mozambique ministry of tourism. The contract amount is 50.039.683, 20 MT, the project content includes construction of two water bridges, with 10% additional workload during the construction period. Project officially started in May 18, 2016, was expected to be completed in November 2016.
State: The construction site of Maputo wild life park is located in Maputo nature reserve.The owner of the project is Mozambique ministry of tourism. The contract amount is 38.815.558, 10 MT, the project content includes construction of civil construction of 4 offices in Wildlife park. Project officially started in April 13th, 2016, was expected to be completed in the end of 2016.
State: Project of drilling boreholes with the client of World Vision was divided into three construction locations in Gaza, Nampula and Tete province. The amount of the contract is $600.000, 00 USD. Project mainly contented drilling 60 boreholes and installing hand pump for each borehole. It had already been completed.
State: The construction site is in Matola city. The client is Mozambique national engineering bureau. The amount of the contract is 17.464.178, 58 MT. Within the project, we drilled 8 boreholes, installed respective hand pump for each borehole as well as 10 mini solar supplied water distribution systems. It had already been completed.
Copyright © 2005 - 2013 Jiangsu Geological Engineering Co., Ltd.
犀牛云提供企业云服务
Address:China, jiangsu, nanjing zhujiang road 28, 700
TEL:0086-25-84815755
FAX:0086-25-84816943
Zip code:210000