Case Case
Case Angola project

Three city water supply design and maintenance of engineering projects

date: 2016-11-01
view: 95

Design and maintenance of three urban water supplies project officially started in 2015 with the duration of 18 months. The main content of the project is to renovate and upgrade the equipment and facilities of water treatment, mechanical and electrical control, reservoir and part of the pipe networks for the water treatment plants in three capital city, Uige, Malanje, Ndalatando in Angola to meet the growing needs of drinking water supply.


Three city water supply design and maintenance of engineering projects


Previous article:noNext article:no
Case / Related Case
close window】【Print
Copyright © 2005 - 2013 Jiangsu Geological Engineering Co., Ltd.
犀牛云提供企业云服务
Address:China, jiangsu, nanjing zhujiang road 28, 700
TEL:0086-25-84815755
FAX:0086-25-84816943
Zip code:210000